3D Modelling
Armstrong Integrated Systems provides more than the traditional 2D CAD drawings; we provide 3D "virtual" plant rooms - engineered to make the difference you can see. Our 3D modelling computerised package, which is a first in plant room development, enables us to build your "virtual" plant room prior to construction. This eliminates many of the concurrent clashes and errors typical with traditional 2D systems.

img

CHW-Series 8000 Pump Module
Click here to download this 3D Model

img

Full Plant Room Assembly with with VIL pumps
Click here to download this 3D Model

img

Packaged Diesel Fire Pump Set
Click here to download this 3D Model

 

Off-Site Manufacture
The Armstrong Integrated Systems commitment to pre-assembly and off-site manufacture brings many benefits to the construction process. Some of these benefits are improved speed of construction, improved quality, reduced costs and environment impact, improved health and safety, as well as improved co-ordination, security and labour saving.

3 Stage Build Plan
The key to our manufacturing flow is our 3 Stage Build Plan. Stage One is the Engineering Phase, where the 3D model is built. Once approved, the model is frozen
and work proceeds to Stage Two. This is the pre-assembly stage and during this phase, pipe and structural calculations are completed and capital plant procured. Following the appropriate confirmations, Stage Three, the final assembly phase, is initiated. Once the base and frame are assembled, the unit is mechanically and electrically fitted-out, tested, insulated and the external cladding system fitted. Following completion of a 172 point inspection checklist, the unit is delivered to the site.